The A1 right at the fence
An A1 motorway junction directly next to the site. Access to national road 88 towards Zabrze and Gliwice and to the road network of the GZM metropolis.

Concept visualisation
Bytom · Miechowice · Poland
Energy Park Bytom is taking shape on 8 hectares of the former Miechowice combined heat and power plant: next to an A1 motorway junction, beside a Fortum heating plant, with demolition in its final stage. It is the first real site of the Industry Energy Park concept.
of land on the former Miechowice CHP plant
motorway junction right next to the site, access to national road 88
chimneys stay as a landmark of the place and its history
of neighbouring former Miechowice coal mine land
History
This land worked for Bytom for more than sixty years. The new chapter starts from what was here.
19th century
Miechowice was once the estate of the Tiele-Winckler family, industrial magnates of Upper Silesia. Eva von Tiele-Winckler, born here and known as Mother Eva (1866–1930), founded the Friedenshort (Ostoja Pokoju) refuge: a home, a school and vocational training for the poor and abandoned, so they could stand on their own feet.
1950–1955
On the foundations of an earlier wartime plant, the Miechowice combined heat and power plant is built and starts operating in 1955. For decades it gives Bytom electricity and heat, and the district work. The Miechowice coal mine operates next door.
1995–2019
In the mid-1990s the plant is thoroughly modernised. From 2011 it belongs to Fortum, which moves heat production to newer, cleaner sources, including a heating plant built on the neighbouring plot. In 2019 the power plant is shut down.
Today
KZRP Group bought the site from Fortum and is completing demolition. Of the whole plant, four chimneys remain. A preliminary architectural concept confirms that a modern industrial park can be built here.
A landmark
In Wolfsburg, the four 125-metre chimneys of the Volkswagen power plant, built between 1961 and 1966, became the symbol of the city and its industrial path. Bytom has four of its own. Let them show that this district's work goes on.
Location
A former power plant site has what cannot be built quickly from scratch: road access, an energy neighbourhood and an industrial character established over decades.
An A1 motorway junction directly next to the site. Access to national road 88 towards Zabrze and Gliwice and to the road network of the GZM metropolis.
Next door runs a Fortum heating plant, part of the system that heats Bytom and Zabrze. Process heat from the park could feed this network instead of escaping into the air.
Infrastructure corridors left by the power plant cross the site. Available capacity and connection terms are confirmed with the grid operator, as in every Industry Energy Park.
On ul. Racjonalizatorów lie 26 ha of former Miechowice coal mine land, earmarked for the Silesia Bytom Park project. Together, the two sites can change this part of the city.
Concept
The preliminary architectural concept lines the new buildings up with the four chimneys. The main building literally grows out of the site's history.

Energy
Energy Park Bytom follows the Industry Energy Park principles: a tenant does not start with a fight for power.
The grid connection, industrial battery storage (BESS) and island mode are planned together with the halls, not after handover.
Waste heat from production or a server room can heat homes through the neighbouring district heating network. Such a model has to be agreed with its operator.
Demolition and site preparation are run by KZRP Group, a specialist in industrial demolition and materials recovery.
For the city
An industrial investment in a district with this history has to make sense beyond the spreadsheet.
The decision to close the Bobrek mine, which works the former Bobrek and Miechowice mining fields, ends another chapter of coal mining in Bytom. Modern industry can offer work close to home.
The chimneys remain a point of orientation and a memory of generations of work. Demolition does not erase history; it makes room for it.
If the park sends heat to the network, energy from Miechowice will once again warm homes in Bytom.
The concept includes an entrance zone with greenery and an industrial memorial square instead of an empty demolition yard.
Who it is for
First step
Describe the planned activity, the area you need and your timing. An e-mail to rafal@kzrp.pl is enough.
We show you the site, the chimneys and the concept, and share the documents needed for a first assessment.
Together we choose the form of cooperation and agree the next steps.
FAQ
In Bytom-Miechowice, Poland, at ul. Elektrownia 18, on the site of the former Miechowice combined heat and power plant. An A1 motorway junction is directly next to it, with a good connection to national road 88.
About 8 ha. The preliminary concept includes a main hall with a footprint of about 13,500 m² and three smaller buildings.
The four chimneys. Other structures are being demolished and the work is nearly finished.
Industry Energy Park is the concept of an industrial park where power supply is part of the property. Energy Park Bytom is its first real site.
KZRP Group. It bought the site from Fortum and is preparing it.
Write to Rafał Jóskowski at rafal@kzrp.pl. Give your type of activity, the area you need and your timing.
Contact
Rafał Jóskowski answers questions from investors, companies, local government and the media. A few sentences about your plans are enough.
Rafał JóskowskiKZRP Group